Keiss Media · Practical resources
Plan and requirements
Agree scope, responsibilities, dependencies and acceptance before production.
- When to use it
- When the concept and prototype are ready for production planning.
- What you will have
- A plan with deliverables, dependencies, owners and open decisions.
- What to check
- Dates and estimates need confirmation from the people responsible for delivery.
View the worked example
The example is fictional. It shows how to record questions and untested work.
Plan and requirements: the example drink learning example
All information is fictional. This is not a commission, an acceptance record, a verified result or a required service package.
Status
An illustrative plan with no agreed dates or fees.
Scope
A landing page, selection of one of three flavours, a game mechanic and a result screen. Physical prizes, accounts and sales are excluded by the example’s premise.
Dependencies
Packaging and copy → prototype → designs and rules → development → testing → launch decision. No calendar dates are assigned.
Campaign
Advertising should lead only to an accepted working release. Media placement and product release dates are unknown.
Integration
No external CRM integration is confirmed. The example does not collect participant identifiers or contact details. If integration is needed, its scope and estimate must be agreed separately.
Acceptance
Flavour selection works, valid moves follow the rules, the result is accessible, and the journey is checked on agreed devices. The complete criteria will be prepared with the requirements.
Change
Registration or a competition is a separate change requiring an estimate, owners and a review of the rules; it is not added silently.
Full workflow: https://keissmedia.com/resources/project-workflow/#plan
Download example (.md)Fill in the template
If an answer is unknown, say so. You can leave fields open and record what needs clarification.
Fields work in your browser. Your text is not sent to us or saved after the page closes. Download the document to continue later.
Sources and adaptation
Keiss Media working guidance and learning examples. This route reuses the library’s existing brief, concept, requirements, scope-change, handover and hosting resources. Their sources and reuse terms are given on the respective pages. The new journey, planning and test-record templates connect those resources; they are not an official standard or a contract. User stories and acceptance criteria were checked against the GOV.UK Service Manual; the distinction between objectives and hypotheses follows 18F Methods. The examples were written for the fictional the example drink project.
Version 1.0 · 5 November 2026